Current Product Standards Project Teams


Project teams are sub-groups of the Product Standards Committee (PSC) focused on a specific scope that may range a single or multiple product standards. Project teams are for ASSE product standards that are less than 4 years old. At or before the 5-year anniversary of the standard's revision, the results of the project teams are compiled and balloted with the PSC for a new revision of the standard in accordance with the Standards Development Procedures. Project team chairpersons give updates on project status to the PSC at the ASSE mid-year and annual meetings.


ACTIVE Project Teams
Standard(s) Project Team ID Members Project Team Scope / Description
1002 FT-17-09 Ho (chair)
Fernandez
Gibeault
Jahrling
Liang
Marbry
Neff
Sparling
Make the requirement in Clause 3.3 of ASSE 1002-2015/ASME A112.1002-2015/CSA B125.12-15 applicable for fill valves intended for retrofit only. For OEM fill valves, the devices shall meet the overflow requirement in Clause 7.9 of ASME A112.19.2/CSA B45.1.
1037 FT-17-08 Jahrling (chair)
Burger
Dickey
Fernandez
Fish
Gleiberman
Ho
Malatesta
Wright
Modify Clause 4.1.4 to allow for a second sample to be tested where the product needs to be altered in order to perform the backflow test.
1016 FT-17-05 Breda (chair)
Gregory
Jahrling
Liang
Neff
modify the scope ASME A112.1016/ASSE 1016/CSA B125.16 to include tub, deck and floor mounted tub and shower fittings with or without hand held shower.


COMPLETED Projects Ready for Product Standards Committee Review
Standard(s) Project Team ID Members Project Team Scope / Description
1002 FT-17-04 Ho (chair)
Chapin
Himmelblau
Jahrling
Liang
Marbry
Martinez
Sigler
Revise Figure 3 in ASME A112.1002/ASSE 1002/CSA B125.12 to provide proper set up for critical level verification. To allow for new product designs, the test setup needed to be revised.
1070 FT-17-02 Liang (chair)
Ballanco
Bertrand
Burger
Campos
Fish
George
Goodson
Himmelblau
Jahrling
Orton
Rawalpindiwala
Remedios
Sigler
Turnau
include requirements for press-connect fittings in ASSE 1070-2015/ASME A112.1070-2015/CSA B125.70-15. Considering the special design and structure of press-connect fitting, the testing in ASSE 1070-2015/ASME A112.1070-2015/CSA B125.70-15 does not fully address the dimension, material and long-term reliability of press-connection. So it’s necessary to reference the ASME B16.51-13 for press-connect fitting.





START OR PARTICIPATE IN PROJECT TEAMS


Project teams may be proposed to the PSC at any time. Fill out the project team proposal form and send it to the Staff Engineering Group so that it can be forwarded to the PSC for review and ballot. Proposals for standards older than 4 years may be given consideration to the next full working group for the standard at the discretion of the PSC. For current active working groups, click here.

Participation on project teams is open to any interested party. If you are interested in applying for a project team, please contact the Staff Engineering Group.